Agent-based Three Layer Framework of Assembly-Oriented Planning and Scheduling for Discrete Manufacturing Enterprises

dc.contributor.authorFan, Yinghui
dc.contributor.authorAnwar, Sohel
dc.contributor.authorWang, Litao
dc.contributor.departmentMechanical and Energy Engineering, School of Engineering and Technologyen_US
dc.date.accessioned2019-05-03T14:25:35Z
dc.date.available2019-05-03T14:25:35Z
dc.date.issued2018-06
dc.description.abstractTo solve the cost burden caused by delivery tardiness for small and medium sized packaging machinery enterprises, the assembly-oriented planning and scheduling is studied based on the multi-agent technology. Taking into account the due date, the planning and scheduling are optimized iteratively with the rule-based algorithms complying with the machining and assembling process constraints. To make the realistic large-scale production planning scheme tailored to fit the optimization algorithms, a multi-agent system is utilized to conceptually construct a three-layer framework corresponding to three planning horizons of different task level. These planning horizons are quarter/month of product/subassembly level, week of part level, and day of operation level. With the strategy of combining top-down task decomposition and bottom-up plan update (where the quarterly orders are decomposed into the monthly, weekly, and daily tasks according to the product processing structure while the resulting plans of every layer are updated iteratively based on the bottom layer optimization), the proposed framework not only addresses the planning but also the periodic and event-driven scheduling of the processes. In this paper, a gravure printing machine is considered as a test case for evaluating the proposed framework. The simulation results with the historical data of the orders for this machine demonstrate the effectiveness of the proposed scheme on the control of the distribution of idle-time. It can also provide a resolution to tardiness penalty for small and medium sized enterprises.en_US
dc.eprint.versionAuthor's manuscripten_US
dc.identifier.citationFan, Y., Anwar, S., & Wang, L. (2018). Agent-based Three Layer Framework of Assembly-Oriented Planning and Scheduling for Discrete Manufacturing Enterprises. 2018 IEEE 14th International Conference on Control and Automation (ICCA), 506–511. https://doi.org/10.1109/ICCA.2018.8444360en_US
dc.identifier.urihttps://hdl.handle.net/1805/19099
dc.language.isoenen_US
dc.publisherIEEEen_US
dc.relation.isversionof10.1109/ICCA.2018.8444360en_US
dc.relation.journal2018 IEEE 14th International Conference on Control and Automationen_US
dc.rightsIUPUI Open Access Policyen_US
dc.sourceAuthoren_US
dc.subjectplanningen_US
dc.subjecttask analysisen_US
dc.subjectjob shop schedulingen_US
dc.titleAgent-based Three Layer Framework of Assembly-Oriented Planning and Scheduling for Discrete Manufacturing Enterprisesen_US
dc.typeArticleen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Fan_2018_agent.pdf
Size:
572.32 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.99 KB
Format:
Item-specific license agreed upon to submission
Description: