System Maintenance Using Several Imperfect Repairs Before a Perfect Repair

dc.contributor.authorSmithson, Haixia
dc.contributor.authorSarkar, Jyotirmoy
dc.contributor.departmentMathematical Sciences, School of Scienceen_US
dc.date.accessioned2022-02-25T19:12:19Z
dc.date.available2022-02-25T19:12:19Z
dc.date.issued2021-01
dc.description.abstractAllowing several imperfect repairs before a perfect repair can lead to a highly reliable and efficient system by reducing repair time and repair cost. Assuming exponential lifetime and exponential repair time, we determine the optimal probability $p$ of choosing a perfect repair over an imperfect repair after each failure. Based on either the limiting availability or the limiting average repair cost per unit time, we determine the optimal number of imperfect repairs before conducting a perfect repair.en_US
dc.eprint.versionFinal published versionen_US
dc.identifier.citationSmithson, H., & Sarkar, J. (2021). System Maintenance Using Several Imperfect Repairs Before a Perfect Repair. Statistics, Optimization & Information Computing, 9(1), 176–188. https://doi.org/10.19139/soic-2310-5070-861en_US
dc.identifier.urihttps://hdl.handle.net/1805/27977
dc.language.isoenen_US
dc.publisherIA Pressen_US
dc.relation.isversionof10.19139/soic-2310-5070-861en_US
dc.relation.journalStatistics, Optimization & Information Computingen_US
dc.rightsAttribution 4.0 International*
dc.rights.urihttps://creativecommons.org/licenses/by/4.0*
dc.sourcePublisheren_US
dc.subjectoptimalityen_US
dc.subjectreliabilityen_US
dc.subjectstochastic processesen_US
dc.titleSystem Maintenance Using Several Imperfect Repairs Before a Perfect Repairen_US
dc.typeArticleen_US
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Smithson2021System-CCBY.pdf
Size:
255.92 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.99 KB
Format:
Item-specific license agreed upon to submission
Description: