- Browse by Subject
Browsing by Subject "combined sewer system"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
Item Analysis of the Flow Performance of the Complex Cross-Section Module to Reduce the Sedimentation in a Combined Sewer Pipe(MDPI, 2020-11) Ji, Hyon Wook; Yoo, Sung Soo; Koo, Dan Daehyun; Kang, Jeong-Hee; Engineering Technology, School of Engineering and TechnologyThe difference in the amount of stormwater and sewage in a combined sewer system is significantly large in areas where heavy rainfall is concentrated. This leads to a low water level and slow flow velocity inside the pipes, which causes sedimentation and odor on non-rainy days. A complex cross-section module increases the flow velocity by creating a small waterway inside the pipe for sewage to flow on non-rainy days. While considering Manning’s equation, we applied the principle where the flow velocity is proportional to two-thirds of the power of the hydraulic radius. The flow velocity of a circular pipe with a diameter of 450 mm and the corresponding complex cross-section module was analyzed by applying Manning’s equation and numerical modeling to show the effects of the complex cross-section module. The tractive force was compared based on a lab-scale experiment. When all conditions were identical except for the cross-sectional shape, the average flow velocity of the complex cross-section module was 14% higher while the size of the transported sand grains was up to 0.5 mm larger. This increase in flow velocity can be even higher if the roughness coefficient of aging pipes can be decreased.Item Hydraulic and Structural Analysis of Complex Cross-Section Reinforced Concrete Pipes to Improve Sewage Flow in a Combined Sewer System(MDPI, 2021-11) Ji, Hyon Wook; Kang, Jeong-Hee; Koo, Dan Daehyun; Yoo, Sung Soo; Engineering Technology, School of Engineering and TechnologyA complex cross-section reinforced concrete pipe that combines a sub-pipe for the flow of sewage in dry weather and a main pipe for the flow of rainwater was developed to reduce sedimentation of the combined sewer system in dry weather. The sub-pipe was designed, considering the flow velocity, constructability, and maintenance. By fitting the sewage data in the dry weather to the normal distribution, the ratio of the cross-sectional area of sewage flow to that of the pipe was determined to be approximately 0.418, which could cover 99.85% of the sewage volume of the target site. Based on this ratio, the diameter of the sub-pipe corresponding to the combined sewer system with a pipe diameter between 450 and 1300 mm was determined. The hydraulic performance analysis results showed that the flow velocity increased by 11 to 12% compared to the circular pipe based on the full sub-pipe and by more than 15% depending on the water level. The shear stress increased by more than 16.5%, and higher tractive force was observed. Structural safety was determined as the crack load and failure load far exceeded the minimum criteria, thereby verifying the feasibility and field applicability of the complex cross-section reinforced concrete pipe.